Pages
Blog Archive
-
▼
2015
(8)
- ► 05/03 - 05/10 (1)
- ► 04/12 - 04/19 (2)
- ► 04/05 - 04/12 (1)
- ► 03/29 - 04/05 (1)
- ► 03/22 - 03/29 (1)
Thursday, November 12, 2015
Friday, June 5, 2015
Laminate, horns, TVs and more!
We have made a lot of progress the past few weeks and are very excited to see the interior starting to go in. A good friend of ours Wade Clay came out from Amarillo to help us laminate and teach us the tricks of the trade. He was an amazing help hands down. Big thanks Wade! I know its been a few weeks since the last post so I'll just upload a bunch of pics. Enjoy!
New Vent Install:
Interior built ready for laminate:
Starting Laminate:
Installing under dash AC Unit:
2- 12 inch sub-woofer compartment installed:
Custom TV's built and installed:
Toilet area started, toilet installed:
Insulation installed:
New flooring started for cab area:
Step area rebuilt and reinforced:
Steering column started. Painted and test fitted with new custom billet steering wheel:
New Vent Install:
Interior built ready for laminate:
Starting Laminate:
Installing under dash AC Unit:
Old transmission cooler |
New transmission cooler and AZ cooler installed with electric fan
Horn installed:
|
Reserve tank |
Pump |
2- 12 inch sub-woofer compartment installed:
Custom TV's built and installed:
Toilet area started, toilet installed:
Insulation installed:
New flooring started for cab area:
Step area rebuilt and reinforced:
Steering column started. Painted and test fitted with new custom billet steering wheel:
Subscribe to:
Posts (Atom)